|











Fuselage
















|
|
|
If the last chapter was the longest one remaining, this is probably the
shortest - done in 3.5h
The holes had to be drilled with an angle drill. |
 |
 |
This is how I fixed it for drilling. |
|
Here I am measuring the right angle for the step. It is aerodynamically
formed and only in the right position (angle) it has minimum drag. |
 |
|
| Hobbes Meter: |
|
Step Installation:
3.5 h
|
|