Fuselage
I started this chapter very early to be able to prime as much parts as possible as long as my wings were not in my "paint shop".
The only little challenge until now was to drill the hinge to the door.
Hobbes Meter:
Baggage Door
5 h
Copyright © 2004-2007 Lorenz Malmström